LACTOENERGO

Biogas

Project Name: LACTOENERGO
(click to open fact sheet and detailed project description)

Project Description:

The biogas plant in Kamenice was put into operation in 2010. It processes approximately 35 000 tons of animal by-products derived from primary agricultural production and 13 000 tons per year of energy crops. Hourly production of biogas, which is produced in two primary digesters with a capacity of 2 700 cubic meters and one secondary digester a volume of 3 400 cubic meters is 400 to 500 cubic meters. The produced biogas is burned in two cogeneration units with a total output of 990 kWel. 

Continue reading

ZD Krásná Hora

Biogas

Project Name: ZD Krásná Hora
(click to open fact sheet and detailed project description)

Project Description:

The biogas plant in Krásná Hora nad Vltavou was put into operation in 2008. It processes annually 15 500 m3 of bovine dung and further processes corn silage in the amount of 8 820 tons per year and grass silage in the amount of 8 750 tons per year, for a total of 33 070 tons of organic waste per year. Hourly production of biogas changes from 250 to 270 m3/h that is produced in a two stage digester type circle in the circle. The produced gas is burned in a cogeneration unit type Jembacher, KH – JMS312 GS total output of 526 kWe. 

Continue reading

Ferti-NRJ

Biogas

Project Name: Ferti-NRJ
(click to open fact sheet and detailed project description)

Project Description:

The centralised biogas plant in Passel-Noyon has been operating since 2009. The plant processes 80% industrial waste such as sludge, greases, screening waste and production scraps, and 20% sewage sludge. It is authorised to process up to 38 000 t/a of waste. The waste is homogenised in a mixing tank before injection in the digestor. Fermentation takes place in two digesters (3000 m3 each).

Continue reading

Bio-Verwertungsgesellschaft Radeberg

Biogas

Project Name: Bio-Verwertungsgesellschaft Radeberg
(click to open fact sheet and detailed project description)

Project Description:

Co-fermentation Plant plant in Radeberg demonstrates that the combined The co-fermentation purification of sludge, domestic and industrial organic waste in an anaerobic sludge plant leads to synergy effects. As part of the extension of the sewage treatment plant, a complete sludge treatment was integrated additional to an aerobic biological purification. Since 1999 two anaerobic waste fermenters process in addition to 41 000 tons of sewage sludge another 15 000 tons of organic waste per year in the plant.

Continue reading

BIOGAZ ZENERIS TECH

Biogas

Project Name: BIOGAZ ZENERIS TECH
(click to open fact sheet and detailed project description)

Project Description:

The desire to manage waste from a nearby distillery, rotten fruit and vegetables (the so-called plant-waste) from supermarkets resulted in the construction of the first agro-industrial biogas plant in Poland. Installation in Skrzatusz is one of the very few biogas plants in Poland, which currently do not generate losses because as a raw material for biogas production uses only the waste, most of which gets for free.

Continue reading

Rudolf Großfurtner

Biogas

Project Name: Rudolf Großfurtner
(click to open fact sheet and detailed project description)

Project Description:

This biogas plant in the village of St. Martin is directly integrated into the largest abattoir of Austria. The company Großfurtner slaughters 550,000 pigs and 50,000 cattle per year. It is the first biogas plant worldwide which exclusively uses slaughterhouse waste as substrate for biogas production. All in all 10,000 tons of blood, rumen content, colon content and grease separation material is used to produce 3.6 Mio. kWh electricity and 3.6 Mio. kWh heat per year.

Continue reading

SELMA

Biogas

Project Name: SELMA
(click to open fact sheet and detailed project description)

Project Description:

The biogas plant in Telč was put into operation in 2014. It processes approximately 11 000 tons of animal by-products from agricultural production, 3 000 tons of energy crops and 3 000 tons of waste per year. Hourly production of biogas, which is produced in the digester with a capacity of 2 900 cubic meters, is 120-150 m3. The produced biogas is burned in a cogeneration unit with a total output of 250 kWe.

Continue reading

Abwasserverband Zirl und Umgebung

Biogas

Project Name: Abwasserverband Zirl und Umgebung
(click to open fact sheet and detailed project description)

Project Description:

The wastewater treatment plant in Zirl is designed for 61,500 population equivalent and has an anaerobic digester with 1,350 m3. In Austria on average wastewater treatment plants can cover 43% of their energy demand by anaerobic digestion of sewage sludge.

Continue reading

REVICO / REVICO Energies vertes

Biogas

Project Name: REVICO
(click to open fact sheet and detailed project description)

Project Description:

The biogas plant in St. Laurent de Cognac was built in 1970 to valorise distillery waste from Cognac production. Approximately 300 000 t/a of vinasses are treated to produce 20000 MWh worth of biogas.

Continue reading

Kernel Export

Food and beverage

Sub-Sector: others
Project Name: Kernel Export fact_sheet_icon_25
(click to open fact sheet and detailed project description)

Changes in the production and energy supply:

  • Production of 4.000 t/y of fertilizers

Project Description:

A 370 KWe biogas has bee implemented on Kernel Export vegetable processing factory.

Continue reading